skip to main content

Air Quality @ Creedmoor Elementary School of the Arts

OFFICIAL REPORTS OF AIR AND SURFACE SAMPLES 

Summer 2018 Testing Process & Results
Following the completion of the HVAC system overhaul in the main building, the entire school was retested for air quality.  The first set of tests were conducted on August 17.  That report showed a normal indoor fungal ecology in all areas except a classroom located on the 2nd floor of the new building.  Those reports are linked below:



LRC laboratories then followed up with additional testing on August 21 in the area near the classroom on the 2nd floor of the upper grades building.  Those results are below:



Remediation crews then cleaned the affected area immediately and the rooms were retested once again on August 23 and 26.  These final results cleared the building.



**********

The latest random air quality tests completed on May 21, 2018 show a normal indoor air ecology.  The reports are listed below.  This will be the final testing before renovations to our HVAC system begin this summer.  Testing will resume after this work is complete.

https://drive.google.com/file/d/1QaHlrP7Kr2voYqAbWDENYY0QGR7Lbfpj/view?usp=sharing

https://drive.google.com/file/d/1aVGJ4mgvbXHqMYYuh3FAbcR3vIlZqrLj/view?usp=sharing


2018 Spring Air Quality Testing has begun, and the first round of testing shows good results.  See below for report for 4-21-18

https://drive.google.com/file/d/1BPZ6mKcmRWmHn8dg7xogNPkqFWAPKhW9/view?usp=sharing

https://drive.google.com/file/d/1l00SnOJY1JohOtm-h5s3RS38slWLmWgC/view?usp=sharing


___________________________________________________________________________________________________

Once again, good results!  The reports below were from tests taken on November 14, 2017:


https://drive.google.com/file/d/1VmB3a66sSGTw5PGkLTxBVIGvVBN5H9QD/view?usp=sharing

https://drive.google.com/file/d/1NE01dsuitOexad7s4gbe-02ubzgUfBdi/view?usp=sharing


Still in the clear!  The results from the tests taken on October 24 show a "normal indoor fungal ecology".  The official reports are listed below:


Good news!  The official reports taken on October 10 show normal air quality.  You can find them below in their entirety:

Below are direct links to the air and surface samples taken at the school on Tuesday, September 26.  The results of these tests show clean air!


Below are direct links to the air and surface samples taken at the school on Tuesday, September 12.  The results of these tests cleared the school for re-entry for staff and students.

https://drive.google.com/file/d/0B25FcKVUbsaFa25xMUxwWUxMWFU/view?usp=sharing

https://drive.google.com/file/d/0B25FcKVUbsaFV0I3UklJRC01LTQ/view?usp=sharing


Official reports of air and surface samples 

Below are direct links to the air and surface samples taken at the school on Sunday, August 27.  The results of these tests cleared the school for re-entry for staff and students.

https://drive.google.com/file/d/0B25FcKVUbsaFLTN3Y051UmNWam8/view?usp=sharing

https://drive.google.com/file/d/0B25FcKVUbsaFanJtWmxOTjJXMHc/view?usp=sharing


Also, please know that the next monitoring re-test will occur on Tuesday, September 12, and the results will be available sometime after that date.

By Dr. Stan Winborne, EdD

ADA Compliance Errors 0